You can get the dimensions on redmount.ie
At the moment no wires have been run. Just 4” ducting to the corner of the garage and it connects the two pits. They have very specific drawings for how it needs to be built.
I have 2 drains in the pits. They don’t say they are needed but my builder put them in.
Sent from my iPhone using Tapatalk