Quote Originally Posted by outofbandii
How do you even begin to package that? Isn't there high risk if it's sent as one long thin piece of metal? Or do you cut/dismantle?
The turbo down pipe and cex at are quite small. Then the cat back is the longest bit. Wrapped t in black bags and then fully wrapped it in one full roll of brown tape.

The lads in Tesco Finglas post office were I. Shock when I walked in ha ha!